Running Time = Net Operating Time – Downtime Losses Downtime Losses: Equipment Failure, Set-Up Time, downtime due to sick leave, quick stops for adjustments or...
by oConsulting | Jan 30, 2020
OEE (Overall Equipment Effectiveness) is a Lean Metric comparing the potential machine performance to the actual performance. It is the product of three factors: Availability, Performance, and Quality. Why work with OEE? To improve equipment / machine productivityTo...
by oConsulting | Jan 30, 2020
Net Operating Time = Total Operating Time – Not Scheduled operating time Not Scheduled times, e.g. due to – breaks & meetings – preventive maintenance – working only in 1 shift (so 2 shifts downtime) – lack of people – weekends...